Larger spans
Up to 60 meters without any columns in between.


Faster construction
Time saved is money earned. PEB save 50% construction time compared to conventional methods. 30,000 sft. building can be made ready for occupation within 10-12 weeks.


Cost effective
Optimum utilization of materials, built-to-design
steel sections, and fast construction, all lead to
direct & indirect cost savings. Reduce foundation
cost with wider bay spacing.

Single source responsibility
Project co-ordination, Construction management
& Cash flow management etc. become easy,
effective & predictable since you are not dealing
with lots of agencies.


Re-locatable
PEB permit future expansions & relocation through
easy dismantling & reassembling.


Custom designed
To suit specific need of the customer & the location.

Peace of mind guaranteed
Reputed, reliable, well equipped manufacturer
undertaking the turn- key responsibility is a big
relief. You can be rest assured of a quality job,
delivered in time.